FOREDECK : New Beneteau Stemhead fitted. Structural strengthening in windlass area. New teak plinth and teak decked panel for windlass. Windlass refurbished. Anchor Locker Lid re-shaped and new hinges and catch fitted. Locker painted out with Danboline and U-bolt for tie off. Wiring renewed and bound in self-amalgamating tape. Foot Switches stripped and cleaned.
DECK : All deck fittings re-bedded. Goiot hatches re-bedded and new perspex fitted. New cabin side windows made of 12mm perspex and fitted. Hatch Garage fitted with teak decking and Solar Panel added. New grabrails fabricated and fitted.
MAST : Mast removed, all fittings checked. New Tri-Colour light with LED fitted. New VHF Antenna with Windex fitted. Standing Rigging & Running Rigging renewed. New Steaming light fitted. Mast 12 volt wiring renewed, along with new deck connectors. Lazy Jacks fitted. New Kicker Tang.
COCKPIT AREA : All cockpit seat slatting removed and replaced where necessary and re-bedded. New teak hatch surround and teak washboards made with locks. New teak panel on face of hatch garage console for instruments. Wheel steering stripped down, greased and refurbished where necessary. Morse engine control cables renewed, including new stop cable in stern locker. Compass light wiring renewed. Switch for Windlass fitted adjacent to Morse Control. New teak decked sole boards made for cockpit floor. U bolts fitted adjacent to hatch entrance for lifelines. Stern bathing platform removed, re-bedded and large s/s backing plates fitted. Lazarette modified to encase and protect steering quadrant, and painted in grey Danboline. 240 volt marina socket fitted under helmsman's seat. All winches stripped down and refurbished.
UNDER-WATER : Hull taken back to gel-coat, heavily abraded and 4 coats of Blakes Gel-Protect SFE200 applied after inspection and favorable moisture readings. Cast fin keel shot blasted, epoxy filled and painted. Rudder stripped back to foam and frame, grp layup, epoxied. All seacocks renewed along with pipework. New P Bracket and Cutlass Bearing bonded in. New Gland Tube bonded in. New prop-shaft. Rope cutter.
HULL/ TOPSIDES : Faired and 2 coats of Epoxy undercoat applied. 2 coats of Oyster White Awlgrip applied along with blue vinyl stripe and new name and number transfers on stern. New aft cabin ports in hull sides fabricated from 10mm smoked perspex and fitted.